PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripping the forms along column line 6.5 (G-C.7) Facing South-East (800x600).jpg Derrick -3 Facing North (800x600).jpg Excavation at Room 173 Facing North-East (800x600).jpg Installing conduit for temporary power Facing South-West (800x600).jpg Installing layout for the wall forms along column line 6.5 (G-C.7) Facing South-West (800x600).jpg Installing rebar along foundation wall and footings at column line 6.5 (G-C.7) Facing South-East (800x600).jpg Metal Decking at Derrick -3 3rd Floor Facing South-East (800x600).jpg Starting working on removing the lines at Cherry St Facing Noth (800x600).jpg Verizon Removing the lines at Cherry St (800x600).jpg